Contact the environmental health office for the county where the property sits before planning an installation, substantial repair or addition. State guidance provides the framework, and the county office can explain the process for the parcel and intended work.
Start with the address and plans
Gather the parcel number, existing permits if available, proposed bedroom count and a sketch showing the house, access, well and areas likely to be disturbed. Tell the office whether the site is undeveloped, the system already exists or a failure has occurred. Ask which plans, evaluations, forms and fees apply.
Coordinate with the installer
Look up the contractor on Georgia DPH’s roster for the type of work you need. Ask who is responsible for site evaluation, permit paperwork, arranging inspections and obtaining the final records. Have those responsibilities spelled out in the quote before scheduling excavation.
Ask about inspection timing
Georgia DPH’s onsite manual calls for inspection before a new onsite system goes into operation. Ask the county and installer when inspections must happen and which parts of the installation need to remain accessible. Work that gets covered too early can be difficult to inspect.
When a home addition is involved
Share the actual floor plan with the county and ask how the proposed use affects permit review. Get the county’s answer before committing to construction, especially when the proposed footprint overlaps the system or the available replacement area.